Lease Road Construction & Maintenance

New access roads built, and washed-out roads put back in shape.

A lease road has to carry rig moves, frac traffic and the pumper’s truck in every kind of weather. We build new access from the county road to the location and we rework roads that have rutted, washed or pumped. The road is shaped to shed water first, because water is what takes a lease road out.

What is included

  • Clearing and grubbing the right-of-way
  • Cutting and compacting the subgrade
  • Hauling, spreading and compacting road rock
  • Crowning, ditching and turnouts so water leaves the road
  • Culverts, low-water crossings and cattle guard approaches
  • Blading and re-rocking existing roads

How the job goes

Lease roads, step by step

  1. Walk the route

    We look at the route from the county road to the location: soil, low spots, crossings, and where water wants to go.

  2. Clear and cut the subgrade

    Timber and brush come off the right-of-way, soft spots are cut out, and the subgrade is shaped and compacted.

  3. Rock and shape

    Road rock is hauled in, spread and compacted, then the road is crowned and ditched so it sheds water.

  4. Crossings and finish

    Culverts, low-water crossings and cattle guard approaches go in, and the road is dressed for traffic.

Questions

Lease roads: what operators ask

How wide and how thick should a lease road be?

Most lease roads run 14 to 20 feet wide with 4 to 8 inches of compacted rock. Heavy rig and frac traffic, soft ground and steep grades all push that up. We size it to the traffic the operator expects.

Can you fix a road without rebuilding it?

Often, yes. If the base is sound, blading the road back to a crown, reopening the ditches and adding rock where it has thinned is enough. If the subgrade is pumping mud through the rock, that section needs to be cut out and rebuilt.

How much does a lease road cost?

It depends mostly on length, width, rock depth and how far the rock is hauled. Our lease road estimator gives a planning range from the size you enter, and a firm bid comes after we walk the route.

What rock is used on lease roads?

It depends on what is available near the location and what the road has to carry. Crushed stone, iron ore gravel and other local road materials are all used in East Texas. We price the material that makes sense for the haul and the traffic.

When is the best time to build a lease road?

When the ground is dry. A road built on dry, compacted subgrade holds up far longer than one pushed in during a wet stretch.

Need lease roads priced?

Tell us where it is and what it needs. You will hear back from a person, not a call center.